Preventing On-Site Structural Rework & Capacity Derating
A design built on assumptions about land contours, soil bearing capacity, roof structural condition, or shading obstructions is a design that gets revised expensively during execution. We've seen projects lose weeks to structural rework because a rooftop's load-bearing capacity wasn't verified upfront, or lose generation capacity because a nearby obstruction wasn't accounted for in the layout. A proper feasibility study removes that risk before it becomes a cost.